Laying on perculating / draining base:
- Remove topsoil until solid subsoil is reached. To ensure good drainage we
recommend grading the subsoil to a slight incline to force underground
drainage.
- Fill in with clean layer of gravel type material to required thickness and
compact in layers as necessary.
- Place mats on gravel bed using kerb edges and optional layer system as
shown to create a firm semi-lattice bond to stop mats moving.
- Insert dowels into fixing holes and interlock adjoining mats as they are laid.
- Cut mats with sharp knife or power-saw (circular or jig-saw)

Laying on solid base:
- Make sure drainage of the existing base is adequate
- If necessary, modify laying plan to prevent movement
- Lay mats as above and anchor using kerb edges or additional layer system

Additional layer system:
PVC Plate - dimensions 150 x 150 x 2 mm (incl. adhesive)

Mounting the layer system:
- Use a silicon gun and evenly apply supplied PU adhesive on the PVC slab.
- Apply adhesive beneath each joint within the semi-lattice bond on the
foundation slab.
- Do not apply adhesive to the solid base